Geotechnical Investigation — 2 Single-Span Bridges, Pujehun and Moyamba

ISC conducted geotechnical investigations for the design and construction of two single-span bridges — one on the Bandajuma–Pujehun Road and one at Moyamba Township.

Client: First Tricon (SL) Ltd
Jun 23, 2026

Project Overview

ISC was engaged by First Tricon to conduct geotechnical investigations for two single-span bridges in Pujehun and Moyamba Districts. The scope included borehole drilling at abutment locations, Standard Penetration Testing, collection of disturbed and undisturbed soil samples, laboratory characterisation, and hydrological analysis. Foundation design recommendations and a comprehensive geotechnical report were delivered to support the bridge design.

Project Details

Category

Infrastructure

Client

First Tricon (SL) Ltd

Date

Jun 23, 2026

Start Your Project

Ready to bring your vision to life? Let's discuss your project needs.

Get Started

Related Projects

Explore more projects in the Infrastructure category

Infrastructure

Geotechnical Investigation — SMHL Tailings Storage Facilities (4 Sites), VIMETCO Sierra Rutile

ISC conducted multi-site geotechnical investigations at four tailings storage facilities at the Sierra Rutile mine site, including 15 CPT-u tests, 12

View Project
Infrastructure

Geotechnical Investigation — GB3 Earth Storage Dam, Sierra Rutile Mine Site

ISC conducted comprehensive geotechnical investigations for the proposed GB3 Earth Storage Dam at the Sierra Rutile mine site, including 14 boreholes,

View Project
Infrastructure

Geotechnical Investigation for Atlantic Bridge Foundation, Freetown

ISC carried out geotechnical investigations to support the foundation design of the Atlantic Bridge in Freetown, including borehole drilling, SPT, and

View Project

Ready to Start Your Project?

Let's work together to bring your engineering and infrastructure vision to life.