Feasibility Study and Engineering Design — 42 m Teko Bridge, Bombali District
ISC delivered the full feasibility study, detailed engineering design, and construction supervision for the 42 m Teko Bridge linking Karineh Village in Makari Gbanti Chiefdom, Bombali District.
Project Overview
The assignment included economic analysis, final alignment establishment, detailed structural drawings and technical specifications, cost estimates, materials testing, and construction quality monitoring. The bridge was designed to improve connectivity between Karineh Village and surrounding communities, enhancing access to health, education, and market services.
Project Details
Category
Infrastructure
Client
Children's Assistant Medical Emergency Relief Program (CAMERP-SL)
Date
Jun 23, 2026
Start Your Project
Ready to bring your vision to life? Let's discuss your project needs.
Get StartedRelated Projects
Explore more projects in the Infrastructure category
Geotechnical Investigation — SMHL Tailings Storage Facilities (4 Sites), VIMETCO Sierra Rutile
ISC conducted multi-site geotechnical investigations at four tailings storage facilities at the Sierra Rutile mine site, including 15 CPT-u tests, 12
View ProjectGeotechnical Investigation — GB3 Earth Storage Dam, Sierra Rutile Mine Site
ISC conducted comprehensive geotechnical investigations for the proposed GB3 Earth Storage Dam at the Sierra Rutile mine site, including 14 boreholes,
View ProjectGeotechnical Investigation for Atlantic Bridge Foundation, Freetown
ISC carried out geotechnical investigations to support the foundation design of the Atlantic Bridge in Freetown, including borehole drilling, SPT, and
View ProjectReady to Start Your Project?
Let's work together to bring your engineering and infrastructure vision to life.